Sample Office Building
Panel LP-2
ABC
| Description | Breaker | CktΦCkt | Breaker | Description |
|---|---|---|---|---|
| OPEN OFFICE LIGHTS NORTH | 20A | 1A2 | 20A | OPEN OFFICE LIGHTS SOUTH |
| WORKSTATIONS 201-206 | 20A | 3B4 | 20A | WORKSTATIONS 207-212 |
| CONFERENCE ROOM 2A | 20A | 5C6 | 20A | COPY ROOM |
| 2PSERVER CLOSET AC | 30A | 7A8 | 20A | KITCHENETTE |
| 2P · with 7SERVER CLOSET AC | 30A | 9B10 | 15A | EXIT SIGNS |
| Not documented | 11C12 | Not documented |
Published November 1, 2026 · version 3 · 12 spaces. A space marked “Not documented” has no record; it is not necessarily a spare.
Circuit Verification
To support ongoing facility maintenance, circuit identification and connected equipment should be field-verified by qualified personnel to confirm that the directory reflects current site conditions.
IMPORTANT ELECTRICAL SAFETY NOTICE
All electrical circuits, equipment, connections, and power sources must be independently field-verified by a qualified electrical professional before performing electrical work or making operational decisions.
Read the full safety notice