Sample Office Building
Panel HP-1
BOY
| Description | Breaker | CktΦCkt | Breaker | Description |
|---|---|---|---|---|
| 3PTRANSFORMER T-1 (FEEDS LP-1) | 125A | 1B2 | 60A | 3PROOFTOP UNIT 2 |
| 3P · with 1TRANSFORMER T-1 (FEEDS LP-1) | 125A | 3O4 | 60A | 3P · with 2ROOFTOP UNIT 2 |
| 3P · with 1TRANSFORMER T-1 (FEEDS LP-1) | 125A | 5Y6 | 60A | 3P · with 2ROOFTOP UNIT 2 |
| 3PELEVATOR 1 | 70A | 7B8 | 30A | 3PCHILLED WATER PUMP 1 |
| 3P · with 7ELEVATOR 1 | 70A | 9O10 | 30A | 3P · with 8CHILLED WATER PUMP 1 |
| 3P · with 7ELEVATOR 1 | 70A | 11Y12 | 30A | 3P · with 8CHILLED WATER PUMP 1 |
Published November 1, 2026 · version 3 · 12 spaces. A space marked “Not documented” has no record; it is not necessarily a spare.
Circuit Verification
To support ongoing facility maintenance, circuit identification and connected equipment should be field-verified by qualified personnel to confirm that the directory reflects current site conditions.
IMPORTANT ELECTRICAL SAFETY NOTICE
All electrical circuits, equipment, connections, and power sources must be independently field-verified by a qualified electrical professional before performing electrical work or making operational decisions.
Read the full safety notice