Sample Office Building
Panel LP-1
ABC
| Description | Breaker | CktΦCkt | Breaker | Description |
|---|---|---|---|---|
| LOBBY LIGHTS | 20A | 1A2 | 20A | RECEPTION RECEPTACLES |
| CORRIDOR LIGHTS | 20A | 3B4 | 20A | BREAK ROOM |
| 3PROOFTOP UNIT 1 | 40A | 5C6 | 30A | 2PWATER HEATER |
| 3P · with 5ROOFTOP UNIT 1 | 40A | 7A8 | 30A | 2P · with 6WATER HEATER |
| 3P · with 5ROOFTOP UNIT 1 | 40A | 9B10 | Not documented | |
| ELEVATOR PIT SUMP | 20A | 11C12 | Not documented |
Published November 1, 2026 · version 3 · 12 spaces. A space marked “Not documented” has no record; it is not necessarily a spare.
Circuit Verification
To support ongoing facility maintenance, circuit identification and connected equipment should be field-verified by qualified personnel to confirm that the directory reflects current site conditions.
IMPORTANT ELECTRICAL SAFETY NOTICE
All electrical circuits, equipment, connections, and power sources must be independently field-verified by a qualified electrical professional before performing electrical work or making operational decisions.
Read the full safety notice