Current Solutions Get a quote

Digital Panel Schedules

A permanent QR label on every panel, and a clear, current, carefully reviewed schedule behind it.

What is included

  • A permanent QR label on each panel. The label carries only the panel's identity. It stays the same when the schedule is edited and published again.
  • A digital panel schedule. The panel's ratings and each circuit: its number, what it feeds, its size and poles, laid out the way a panel directory is.
  • A published copy. What a scan shows is a copy that was checked and deliberately published. Changes being worked on are not shown until they are published.
  • A private PIN. Scanning a label asks for the PIN. Reading never changes anything; correcting a schedule needs a separate editing PIN.
  • A complete history. Every published version is kept and can be compared with the one before it.

Panel LP-1

Level 1 electrical room120/208V3Φ, 4W225A Main

ABC

Odd circuits on the left, even circuits on the right, phase in the middle. Each space is drawn as a breaker with its size in amps on the handle. The drawing does not show whether a breaker is on.
DescriptionBreakerCktΦCktBreakerDescription
LOBBY LIGHTS20A1A220ARECEPTION RECEPTACLES
CORRIDOR LIGHTS20A3B420ABREAK ROOM
3PROOFTOP UNIT 140A5C630A2PWATER HEATER
3P · with 5ROOFTOP UNIT 140A7A830A2P · with 6WATER HEATER
3P · with 5ROOFTOP UNIT 140A9B10Not documented
ELEVATOR PIT SUMP20A11C12Not documented
7 breakers documented · 12 spacesΦ by position in the standard layout: verify at the panelThe breakers are a drawing: this page does not show whether a breaker is on, off or tripped.
CURRENT SOLUTIONSPANEL LP-1
Scan the sample label with your phone's camera to walk through a sample building the way your team would see it. Or open the sample building here. The names and circuits are made up.

How a panel receives its label

  1. We register your building and its panelsEvery panel is assigned a permanent identity that stays with it for the life of the building.
  2. We document each panel's scheduleWorking from the panel itself and your existing records, each circuit is reviewed before anything is published.
  3. We install a permanent QR label on each panelThe label never needs to be replaced, even when the schedule is revised later.
  4. Your team scans and readsScan the label with a phone camera, enter the PIN, and that panel's current schedule appears on the screen, with every other panel of the building one tap away and every building of the customer one more. There is no app to install.

For the people who work in the building

At the panel

Scan the label with a phone camera and enter the PIN. The schedule opens in the phone's browser. There is no app to install and no account to create.

In the customer portal

Building owners and the people they authorize sign in to view the published schedules of the buildings assigned to them. Customer login

For information only. A panel schedule can be out of date or wrong. It does not replace verifying at the panel, lockout/tagout, testing for voltage or any other required safety procedure.

IMPORTANT ELECTRICAL SAFETY NOTICE. All electrical circuits, equipment, connections, and power sources must be independently field-verified by a qualified electrical professional before performing electrical work or making operational decisions. Read the full safety notice

Bring your building's electrical records up to date

Share a few details about your facility, including its location and the approximate number of electrical panels. We will review your request and respond with a written quote prepared for your building.